Strategic cost management
1. A Company is considering replacing one of existing machine with either a state of the art "Automatic Machine" which will reduce the labor cost by 80% or with a standard machine. The automatic machine will cost ₹ 2,50,000 with an estimated life of 5 year, whereas the standard machine will cost ₹ 2,00,000 with an estimated life of 8 year. Both machine have no residual value. Assume tax rate to be 40%.
The annual sales and costs are estimated as below:
Automatic Machine (₹) Standard Machine (₹)
Sales 200,000 200,000
Costs:
Materials 40,000 40,000
Labour 40,000 70,000
Variable Overhe2a0d,0s00 15,000
Calculate the payback period and advice the management.
(10 Marks)
2. ABC Limited has provided following information related to sales, cost and margins for March 2020:
Sales (₹) ₹ 150,000
Total Cost ₹ 120,000
Fixed Cost ₹ 45,000
Net Profit ₹ 30,000
Calculate P/V ratio, Break-even Point (Sales), and Margin of Safety. (10 Marks)
3. You have been hired as a consultant by an auto parts manufacturing company. The company is currently dealing with an issue with production of defective components costing them loss of customers and sales. Company has identified that the main issue lies with a component supplier. The company has already gathered some information but unable to make a decision. You have been provided with this information, the company can purchase the components in question from two suppliers, existing supplier A or new Supplier B. The price quoted by Supplier A is ₹18.00 per 100 numbers of the components and it is found that on an average 5% of the total receipt from this supplier is defective. The corresponding quotation from Supplier B is ₹15.00 per 100 numbers of the components but the defectives would go up to 10% for the total supply. If the defectives are not detected, they are utilized in production causing a damage of ₹18 per 100 components. The company intends to introduce a system of inspection for the components on receipt which would cost ₹5.00 per 100 components. The new inspection system will be able to detect only 90% of the defective components received. No payment will be made for defective components in inspection. Assume total requirements of components to be 25,000 numbers.
(Hint: Use total cost for your analysis and recommendation.
You are asked to advice company management on:
a. Whether inspection at the point of receipt is justified? (5 Marks)
b. Which of the two suppliers should be asked tosupply? (5 Marks)
GET SOLVED ASSIGNMENTSWeb site www.nmimssolvedassignments.comMail us at Assignmentsmba12@gmail.com
Neha- 9873368830 (WHATSAPP)
YOU ARE READING
NMIMS SOLVED ASSIGNMENTS
ActionWE PROVIDE NMIMS NARSEE MONJEE SEPTEMBER SOLVED ASSIGNMENTS 2019 GET SOLVED ASSIGNMENTS Mail us at Assignmentsmba12@gmail.com Neha- 9873368830 (WHATSAPP)